Tampilkan postingan dengan label India. Tampilkan semua postingan
Tampilkan postingan dengan label India. Tampilkan semua postingan

LCA TEJAS NAVY MAIDEN FLIGHT








courtesy photos by Sanjay Simha
credit to Livefist.blogspot.com
HAL DHRUV




General characteristics

    Crew: 1 or 2 pilots
    Capacity: 4 to 12 passengers
    Length: 15.87 m (52 ft 0.8 in)
    Rotor diameter: 13.20 m (43 ft 3.7 in)
    Height: 4.98 m (16 ft 4.06 in)
    Disc area: 137 m² (1,472 ft²)
    Empty weight: 2,502 kg (5,515 lb)
    Useful load: 2,600 kg (5731 lb)
    Max. takeoff weight: 5,500 kg (12,125 lb)
    Powerplant: 2 × Shakti turboshafts, 1,000 kW (1,400 shp[119])
    Alternate engine: 2 x Turbomeca TM 333-2B2 turboshaft, 746 kW (1,000 shp) each

Performance

    Maximum speed: 290 km/h (180 mph, 156.58 kn)
    Combat radius: 320 km (200 mi, 175 nmi)
    Ferry range: 827 km (516 mi, 447 nmi)
    Service ceiling: 8,382 m (27,500 ft)
    Rate of climb: 8.9 m/s (1,771 ft/min)
    Power/mass: 329.73 W/kg (0.20 hp/lb)

Armament

    Missiles:
        8 Anti-tank guided missiles
        4 Air-to-air missiles
        4 x 68 mm Rocket Pods (Air-Force & Army)
        2 Torpedoes
        Depth charges or Anti-ship missiles






Shakti Engine




Credit to :
* Wikipedia
* Livefist.blogspot.com
* Google


LCA TEJAS LSP-7






DRDO Statement: Tejas Limited Series Production - 7 (LSP-7) aircraft took-off for its maiden flight from HAL airport at 4:27 pm on 9th March 2012. This test flight is significant for the program, as LSP -7 build-standard is close to the initial operational clearance (IOC) standard. Accordingly LSP -7 aircraft, along with LSP - 8 will be offered to the Indian Air Force for user evaluation trials (UET). The flight was also significant considering the fact that for the first time “Production Test Schedule” was used for the first flight of an LSP aircraft in this program. This is also the first time that maiden flight of the aircraft was not accompanied by the customary ‘chase’ aircraft, which is an indicator to the level of confidence in the machine. The flight lasted 28 minutes with Gp Capt KK Venugopal at the controls in the cockpit and Wg Cdr Kabadwal of the National Flight Test Centre (NFTC) as Test Director in the telemetry. During the test flight, performance of the aircraft systems including Multi-mode Radar (MMR), Helmet Mounted Display System (HMDS), Auto-pilot and Instrument Landing System (ILS) was satisfactory, providing a moment of pride for all the stake holders which include ADA, HAL, IAF, CEMILAC, DG AQA, ADE and NAL among others.






Credit to Livefist.blogspot.com




LCA Tejas at AERO INDIA 2011

Day 1 Air Display



photos by Maj VK Singh
credit to Livefist.blogspot.com

LCA Tejas MK2

LCA NAVY / Tejas MK2 Model


credit to Livefist.blogspot.com

LCA Tejas Initial Operational Clerance (IOC)


10 Januari akan menjadi tonggak bersejarah dari proyek ADA yaitu Initial operational clearance (IOC) dari HAL Tejas berikut adalah update berita dan gambar mengutip dari team Livefist.blogspot.com.


Press conference dari IAF Chief PV Naik

10 Januari 2011.
Air Chief Marshal PV Naik today said, "At present it is not a fourth generation aircraft. It will come up." Earlier, when questioned about the parameters on the Tejas that the IAF was not fully satisfied with, he said, "There are several refinements required. We need full compliance, after all we have waited a long time."


10 Januari 2011.
Pihak IAF enggan mengomentari IOC LCA Tejas dan lebih menginginkan pembuataan 83 unit Tejas MK II, apakah ini indikasi bahwa IAF belum puas akan hasil dari IOC Tejas, berikut saduran berita dari Livefist.blogspot.com :

On a painfully sunny day at Bangalore's old HAL airport, India's Tejas light combat aircraft achieved initial operational clearance (IOC) today for induction into the Indian Air Force. With two aircraft to be delivered to the IAF in June and two more by December, the IAF for the first time has full access to the aircraft. But IAF chief Air Chief Marshal PV Naik was visibly more subdued than any of the others today, and despite the supposed sanctity of the ceremony (for some idiotic reason, an MLA and an MP were felicitated instead of the scientists), he chose to give voice to his irritation a few yards away from two Tejases gleaming in the sun -- a fighter and a trainer.

"There are some areas where work still needs to be done. There are aspects that need to be improved. We have agreed to a list of concessions for IOC. But we are sure that ADA will fulfil those by June, with full operational clearance in a couple of years. The refinements we are looking for include wake penetration tests, all weather clearance, lightning clearance, etc. Some parameters have only been partly tested. After all, we've waited a long time for the Tejas. We don't want a partial platform. We want everything fully operational," he said.

Shortly after two Tejases roared into the sky for a quick flight display, Naik went on to describe the Tejas as a "MiG-21++" fighter, and went on to say, "At present it is not a fourth generation aircraft. It will come up, but at present it is not." He also indicated that the Tejas Mk-II would not only be powered by the F414 engine, but would incorporate airframe design changes and newer avionics. A statement issued today by ADA today said that the IAF had projected a need for 83 Tejas Mk-II aircraft (which would give the IAF a fleet of 123 aircraft in total -- far less than projected). The first flight of the Mk-II is scheduled for December 2014. Indigenous content on the Mk-II will be 75 per cent according to the HAL chief.

HAL chairman Ashok Nayak said that the company's capacity to churn out ten Tejas fighters a year could be ramped up if the need arose -- current capacity jointly shared by the Hawk and Tejas lines could be made into a dedicated Tejas line, he said. The unit cost of a Tejas will be between Rs 180-200 crore.

ADA said in a statement that the following would bridge the gap between initial and final operational clearance: integration of beyond visual range weapons, gun, rockets, guided and unguided bombs, and the further expansion of its flight envelope to -3.5 to 8G (-2 to 6G for IOC) and 24-degrees angle of attack (22 for IOC).

Masalah Landing gear sudah terselesaikan maka LCA Navy siap take off segera


Took this photo of Commodore CD Balaji, director of the LCA Navy programme at the Tejas IOC event on Monday. He's a man under a lot of stress and it showed. He looked distracted, he paced constantly. The LCA-N missed its December 2010 first flight deadline as a result of confidence levels over landing gear and other issues according to sources, though the team (with help from EADS) is working hard to get past niggles and put the jet into the air sometime in the next three months. More details soon.

credits to Livefist.blogspot.com